Working for d3 Technologies Luke installed the control for Millenia Tower's new lighting system. Alongside Zak Haywood of d3 Technologies Luke put together a series of design options for the hourly show. Luke also setup the d3 to run to a schedule so that each evening the tower would put on a 6 minute display on the hour every hour before returning to its full white state.